Karlville continues to lead global innovation with the introduction of the 2 Meter STEAMER. The Steamer 2M can handle up to 200 bottles per minute. The Steamer design, with an integrated boiler allows companies to save money and time, because they do not need to install stand alone steam boiler on site.
The internal design of the tunnel, along with the dual blower exhaust system allows for high temperature generation with consistent internal pressure and low power consumption.
Click here to wacth a video of the STEAMER Tunnel.
Its main features are:
- No need to build separate boiler rooms to house boilers
- No need to hire engineers to design and permit boiler rooms
- No Need for costly overhead insulated steam pipe infrastructure
- Ideal to integrate to mid speed range applicators such as ourSleevePro 150
- Excellent quality, performance and low utility requirement
- Plug & Play
- Fully adjustable pipes for excellent steam distribution
- Quick changeover
- The STEAMER tunnel comes in both 1M and 2M designs
Fully Adjustable Internal Chamber
The STEAMER has a unique chamber design that allows maximum efficiency. The internal chamber adjusts to match the container profile through operator hand dial.
- 5 Internal Ball Valves
- Higher Temp. Achieved
- Higher Speeds
- Reduce Exhaust
For more information about the STEAMER Tunnel visit twww.karlville.com
Comments
Post a Comment